首页 | 本学科首页   官方微博 | 高级检索  
     检索      

三台阶核心土环形开挖法在广以隧道中的应用
引用本文:付天正.三台阶核心土环形开挖法在广以隧道中的应用[J].水运科技信息,2009(4):55-57.
作者姓名:付天正
作者单位:贵州省交通规划勘察设计研究院,贵阳550002
摘    要:三台阶核心土环形开挖法是在台阶分部法基础上演变而来的,它集中了台阶法、台阶分部法、上下导坑法等优点。广以隧道地层较老,岩石破碎、节理发育、石质较软,围岩以Ⅳ、Ⅴ及Ⅵ级为主,施工难度极大。文中介绍了三台阶核心土环形开挖法,以及与之相匹配的超前支护、初期支护、防排水及二次衬砌施工等工法。

关 键 词:隧道施工  围岩类别  三台阶核心土环形开挖法

Three-bench Ring-like Excavation for Core Soil in the Construction of Guangyi Tunnel
Fu Tianzheng.Three-bench Ring-like Excavation for Core Soil in the Construction of Guangyi Tunnel[J].Transportation Science & Technology,2009(4):55-57.
Authors:Fu Tianzheng
Institution:Fu Tianzheng (Guizhou Provincial Communications Planning Survey & Design Institute, Guiyang 550002, China)
Abstract:The three-bench ring-like excavation for core soil method, developed based on the partial bench excavation, incorporates advantages of bench excavation, partial bench excavation, and top bottom heading excavation methods. The Guangyi Tunnel stands right above some old strata containing shattered, soft rocks and developed divisional planes, where most enclosing rocks are Category Ⅳ, Ⅴ and Ⅵ. Therefore, the construction could be very complicated and challenging. This article mainly introduces the three-bench ring-like excavation for core soil method as well as the supplementary construction techniques such as advanced support, primary support, waterproof & water drainage, secondary lining construction, etc. , hoping to attract more studies and discussions on this subject.
Keywords:tunnel construction  enclosing rock category  threebench ring-like excavation for core soil method
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号