首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Optimizing the freight train connection service network of a large-scale rail system
Authors:Bo-Liang Lin  Zhi-Mei Wang  Li-Jun Ji  Ya-Ming Tian  Guo-Qing Zhou
Institution:1. School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044, China;2. MOE Key Laboratory for Urban Transportation Complex Systems Theory and Technology, Beijing Jiaotong University, Beijing 100044, China;3. State Key Laboratory of Rail Traffic Control and Safety, Beijing Jiaotong University, Beijing 100044, China;4. Department of Civil and Environmental Engineering, Old Dominion University, Norfolk, VA 23529, USA
Abstract:This paper presents a formulation and solution for the train connection services (TCSs) problem in a large-scale rail network in order to determine the optimal freight train services, the frequency of services, and the distribution of classification workload among yards. TCS problem is modeled as a bi-level programming problem. The upper-level is intended to find an optimal train connection service, and the lower-level is used for assigning each shipment to a sequence of train services and determining the frequency of services.Our model solves the TCS problem of the China railway system, which is one of the largest railway systems in the world. The system consists of 5544 stations, and over 520,000 shipments using this system for a year period. A subnetwork is defined with 127 yards having some minimum level of reclassification resources and 14,440 demands obtained by aggregating 520,000 shipments to the subnetwork. We apply a simulated annealing algorithm to the data for optimal computation after pre-processing and get an excellent result. Comparing our optimal solution with the existing plan result, there are improvements of about 20.8% in the total cost.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号