首页 | 本学科首页   官方微博 | 高级检索  
     检索      

硬岩隧道掘进机常见机械故障分析及相应处理方法
引用本文:张勇智.硬岩隧道掘进机常见机械故障分析及相应处理方法[J].现代隧道技术,2006,43(6):76-79.
作者姓名:张勇智
作者单位:Cooperativa Muratori
摘    要:文章对能够造成硬岩隧道掘进机(TBM)在掘进中调向失控、刀盘不能启动、刀盘突然停转以及护盾不能正常工作等多种机械故障的原因进行了分析,并提出了切实可行的解决方案,对日后同类型TBM的施工有参考作用。

关 键 词:硬岩隧道  掘进机施工  机械故障分析  处理
文章编号:1009-6582(2006)06-0076-04

Analysis of the breakdowns of TBMs in boring hard rocks and their corresponding countermeasures
Zhang Yongzhi.Analysis of the breakdowns of TBMs in boring hard rocks and their corresponding countermeasures[J].Modern Tunnelling Technology,2006,43(6):76-79.
Authors:Zhang Yongzhi
Abstract:The paper analyzes the breakdowns of TBMs in boring through hard rocks such as: orientation out of control;unable to start the cutterhead;sudden stop of the cutterhead and the shield of a TBM not in normal working condition etc.,presents adaptable treatment options which can be reffered to by similar TBM projects.
Keywords:Hard rock tunnel  TBM construction  Breakdown of machines  Analysis  Treatment
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号