朔黄铁路机车功率因数试验研究
引用本文:刘东来,魏俦元,吴广宁,高国强,朱毅刚,张云.朔黄铁路机车功率因数试验研究[J].电力机车与城轨车辆,2013,36(1):55-59.
作者姓名:刘东来  魏俦元  吴广宁  高国强  朱毅刚  张云
作者单位:1. 西南交通大学电气工程学院,四川成都,610031
2. 朔黄铁路发展有限责任公司,河北肃宁,062350
3. 广东电网惠州供电局,广东惠州,516001
基金项目:铁道部科技研究开发计划(2007J036);国家973项目(2011CB711105)
摘    要:朔黄铁路开行万吨重载列车以来,机车功率因数的问题尤其突出。文章通过在朔黄铁路现场进行的实时同步试验,对机车在朔黄铁路各区段的运行特点进行了分析。首先,将各区段归纳成了3组,结合地形分别解析了各组中的机车轻、重载时的功率因数问题,发现了朔黄线机车功率因数较低的现况。其次,由于某些区段独特的地形因素,机车在实际运行中出现了与常识相悖的运行工况,即机车重载运行时的功率因数低于其轻载运行时的功率因数。文章针对这一反常情况也一并进行了分析。最后,提出了相应的改进措施。

关 键 词:朔黄铁路  功率因数  地形因素  SS4B型电力机车  重载

Experimental investigation on power factor of locomotive on Shuohuang Railway
LIU Dong-lai , WEI Chou-yuan , WU Guang-ning , GAO Guo-qiang , ZHU Yi-gang , ZHANG Yun.Experimental investigation on power factor of locomotive on Shuohuang Railway[J].Electric Locomotives & Mass Transit Vehicles,2013,36(1):55-59.
Authors:LIU Dong-lai  WEI Chou-yuan  WU Guang-ning  GAO Guo-qiang  ZHU Yi-gang  ZHANG Yun
Institution:1.School of Electrical Engineering,Southwest Jiaotong University,Chengdu 610031,China; 2.Shuohuang Railway Development Co.,Ltd.,Suning 062350,China; 3.Huizhou Power Supply Bureau of Guangdong Power Grid Company,Huizhou 516001,China)
Abstract:Since ten thousand tons train started up on Shuohuang Railway,some problems about the power factor of electric locomotive has been especially prominent.Based on the real time synchronous testing data of Shuohuang Railway,the paper analyzes the operating characteristics of locomotive on each section of the railway.At first,all sections are divided into three groups,and some problems about power factor of locomotive which is in light or heavy haul is analyzed separately from consideration of terrain.And it is found that the power factor of locomotive moving on Shuohuang Railway is too low.Secondly,the working condition has arisen,which is inconsistent with common sense,due to the unique characteristics of the terrain of some sections.Namely the power factor of the heavy haul locomotive is lower than which of the light burden locomotive.In this paper,this anomaly is also analyzed.Finally,the appropriate solution is presented.
Keywords:Shuohuang Railway  power factor  terrain  type SS4B electric locomotive  heavy haul