连续梁匹配预制悬臂拼装测量控制技术 |
| |
引用本文: | 黄国忠,古付军,周翰斌,郑彬.连续梁匹配预制悬臂拼装测量控制技术[J].华南港工,2007(1). |
| |
作者姓名: | 黄国忠 古付军 周翰斌 郑彬 |
| |
作者单位: | 中交四航局第一工程有限公司 广东广州510500 |
| |
摘 要: | 结合广州市轨道交通四号线11标连续梁采用匹配悬臂拼装施工的测量控制中遇见问题,对连续梁悬臂拼装施工的线形控制、标高及合拢段测量控制技术作一描述。
|
关 键 词: | 匹配连续梁 悬臂拼装 测量控制 |
Survey Control Technology for the Installation of Prefabricated Matching Members of Continuous Beams |
| |
Authors: | HUANG Guo-zhong GU Fu-jun ZHUO Han-bin ZHENG Bin |
| |
Abstract: | Combining problems met in the survey control of matching member of continuous beams of contract section 11 of Line 4 of Guangzhou Track Communication System, it summarizes the control technology of linearity, level, verticality and closure for the reference of all viewers. |
| |
Keywords: | matching continuous beam assembly in a cantilever way survey control |