首页 | 本学科首页   官方微博 | 高级检索  
     检索      

防城港港区铁路规划方案研究
引用本文:陈刚.防城港港区铁路规划方案研究[J].铁道标准设计通讯,2018(1):45-51.
作者姓名:陈刚
作者单位:中铁二院工程集团有限责任公司;
摘    要:防城港港区既有铁路运输能力已接近饱和,为满足港区规划新增运量的运输需求,需对港区铁路改扩建方案进行规划研究。在详细分析港区既有铁路、运量预测和发展规划的基础上,提出港区设置3个车场和设置4个车场两个方案。通过对三场、四场方案的深入研究比选,推荐三场方案作为港区铁路规划方案。推荐方案不仅能满足港区未来新增吞吐量的集散需求,也对西南铁路出海大通道海铁联运的发展提供有力支撑。

关 键 词:港区铁路  规划  车场设置  方案比选

Study on Railway Planning Scheme of Fangchenggang Port Area
Institution:,China Railway Eryuan Engineering Group Co.,Ltd.
Abstract:As the existing railway transport capacity of Fangchenggang port is close to saturation,it is necessary to study the reconstruction and extension plan of the port area to meet the planned additional traffic volume of the port area. This paper puts forward two schemes with three yards and four yards respectively based on detailed analysis of the existing railway,forecast of traffic volume and development plan of the port area. The three-yard scheme is finally recommended through the comparison of advantages and disadvantages between three-yard and four-yard schemes. The scheme recommended can not only meet the demand for railway traffic volume of the port area in the future,but also provide a strong support for the development of the rail-sea intermodal transportation in the southwest railway corridor.
Keywords:Port railway  Planning  Yard setting  Scheme comparison
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号