南京长江四桥北锚锭基础施工方案 |
| |
引用本文: | 高晶晶.南京长江四桥北锚锭基础施工方案[J].北方交通,2011(1). |
| |
作者姓名: | 高晶晶 |
| |
作者单位: | 陕西铁路工程职业技术学院,渭南,714000 |
| |
摘 要: | 以南京长江四桥北锚碇基础为例,介绍大型沉井在岩面倾斜、高差大、地层性质不均,砂土液化严重以及施工场地狭小的条件下施工的方法和经验。
|
关 键 词: | 大型沉井 岩面倾斜 砂土液化 场地狭小 |
The Construction Scheme of the Foundation in the North Anchor of The Forth Nanjing Yangtze River Bridge |
| |
Authors: | GAO Jing-jing |
| |
Institution: | GAO Jing-jing |
| |
Abstract: | This paper introduces the method and experience of the construction scheme of the foundation in the north anchor of the forth Nanjing Yangtze River bridge,where exits oblique scar and liquefaction of sand.And it is narrow construction site. |
| |
Keywords: | Large open caisson Oblique scar Liquefaction of sand Narrow construction site |
本文献已被 CNKI 万方数据 等数据库收录! |
|