T梁桥绳锯切割拆除方案优化研究与数值模拟分析
引用本文:袁鑫,朱超宇,郑伟.T梁桥绳锯切割拆除方案优化研究与数值模拟分析[J].公路,2020(3):92-100.
作者姓名:袁鑫  朱超宇  郑伟
作者单位:苏州科技大学土木工程学院;江苏省结构工程重点实验室;苏州中恒通路桥股份有限公司
基金项目:国家自然科学基金项目,项目编号51508368;2018年江苏省研究生科研与实践创新计划项目,项目编号SJCX18_0879;2018年江苏省大学生创新重点训练项目,项目编号201810332019Z。
摘    要:为了研究先简支后连续的T梁桥的整体切割拆除关键技术,以三洲沧江拆除工程为研究背景,结合大桥实际情况制订了针对性的大桥上、下部结构整体拆除施工方案。验证了采用2台80t汽车吊分别站位于旧桥左右幅,将左幅旧桥各跨8片独立的T梁分别进行吊运的绳锯切割拆除方法为最优方案。以典型的简支T梁桥结构为例,采用有限元模型分析了拆除工程中T梁桥的力学性能变化。针对三洲沧江大桥的下部结构特点,特别对水上桥墩的拆除方案进行了数值分析,并对钢抱箍平台上拆除盖梁的方案进行了仿真模拟,验证了下部结构拆除方案的可操作性。本桥梁绳锯切割拆除工程的优化方案及关键技术的应用为相似桥梁切割拆除工程提供一定的参考。

关 键 词:T梁桥  绳锯切割  整体拆除  先简支后连续  仿真模型  力学效应  分析

Research and Numerical Simulation Analysis on the Optimization of Wire Saw Cutting and Demolition of T-Beam Bridge
YUAN Xin,ZHU Chao-yu,ZHENG Wei.Research and Numerical Simulation Analysis on the Optimization of Wire Saw Cutting and Demolition of T-Beam Bridge[J].Highway,2020(3):92-100.
Authors:YUAN Xin  ZHU Chao-yu  ZHENG Wei
Institution:(School of Civil Engineering,Suzhou University of Science and Technology,Suzhou 215011,China;Jiangsu Provincial Key laboratory of Structural Engineering,Suzhou 215011,China;Suzhou Zhonghengtong Road&Bridge Co.Ltd.,Suzhou 215000,China)
Abstract:In order to study the key technology of the overall cutting and demolition of the simply supported-continuous T-beam bridge,the demolition project of the Sanzhou Cangjiang Bridge is studied in this article,and the overall demolition construction plan of the bridge superstructure and substructure is formulated by considering the actual situation.Using two 80tcar cranes to stand on the left and right side of the old bridge and separately lifting the eight old T-beams of the left old bridge is recommend as the wire saw cutting and demolition scheme.It is verified that the recommended the wire saw cutting and demolition method is the optimal scheme.the mechanical properties of the T-beam bridge during the demolition process is analyzed with finite element model.Based on the characteristics of the substructure of Sanzhou Cangjiang Bridge,the wire saw cutting and demolition scheme of the bridge piers is especially analyzed,and the scheme of removing the bent cap on the steel hoop platform is simulated.It has verified the operability of the substructure removal scheme.The construction scheme and key technology of the bridge wire saw cutting and demolition project and its application provide a certain reference value for similar bridge demolition projects.
Keywords:T-beam bridge  wire saw cutting  overall demolition  simply supported to continuous  simulation model  mechanical effect  analysis