首页 | 本学科首页   官方微博 | 高级检索  
     检索      

胶新铁路路桥过渡段路基沉降规律研究
引用本文:乔东华,刘升传.胶新铁路路桥过渡段路基沉降规律研究[J].路基工程,2011,0(6):45-48.
作者姓名:乔东华  刘升传
作者单位:1.贵州省交通规划勘察设计研究院, 贵阳 550001
摘    要:桥头跳车问题影响着铁路建设和运营,迫切需要解决。结合胶新铁路当地实际情况,开展相关研究,有效减轻差异沉降和桥头跳车的影响,具有重要的现实意义。首先介绍了胶新铁路试验段的基本情况以及试验采用的仪器和测试原理,然后详细分析了不同地段通车前和通车后路桥过渡段的沉降变形特征。

关 键 词:胶新铁路    路桥过渡段    路基沉降
收稿时间:2019-11-09

Analysis on Subgrade Settlement Law in Road-Bridge Transition Section of Jiaozhou-Xinyi Railway
Authors:QIAO Dong-hua  LIU Sheng-chuan
Institution:1. Guizhou Communication Planning Survey & Design Institute, Guiyang 550001, China; 2. Highway Research Institute, Ministry of Transport, Beijing 100088, China)
Abstract:The problem of bumping at bridge head affects railway constriction and operation, which need to be solved urgently. Combined with the local practice of Jiaozhou-Xinyi Railway, related research is conducted to effectively reduce the influence of differential settlement and bumping, which has important practical significance. This paper first introduced the basic situation of Jiaozhou-Xinyi Railway test section and the instrumentation and principle for test; then analyzed the settlement characteristics of road-bridge transition section in different sections before and after opening to traffic.
Keywords:Jiaozhou-Xinyi Railway  road-bridge transition section  subgrade settlement
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《路基工程》浏览原始摘要信息
点击此处可从《路基工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号