首页 | 本学科首页   官方微博 | 高级检索  
     检索      

节段预制拼装整体横移48m箱梁施工技术
引用本文:王增虎.节段预制拼装整体横移48m箱梁施工技术[J].铁道建筑技术,2010(5):83-86,111.
作者姓名:王增虎
作者单位:中铁二十一局集团第三工程有限公司,陕西咸阳,712000
摘    要:包西铁路甘泉洛河大桥为6条单线组成的跨洛河大桥,设计第6至第11孔采用移动支架造桥机节段拼装施工技术,实际采用了在2线膺架上节段组拼整体横移技术。主要从施工方案比选、膺架布设、拼装、横移施工方法、工艺流程等方面对该技术进行了阐述。

关 键 词:膺架布设  节段拼装  整体横移  箱梁

Construction Technique of 48 m Box Beams in Integrated Transverse Movement of Segmental Prefabricated Assembly
Wang Zenghu.Construction Technique of 48 m Box Beams in Integrated Transverse Movement of Segmental Prefabricated Assembly[J].Railway Construction Technology,2010(5):83-86,111.
Authors:Wang Zenghu
Institution:Wang Zenghu ( China Railway 21 st Bureau Group Co. Ltd. , Xianyang 712000, China)
Abstract:Bao-Xi Railway Ganquanluohe Large Bridge is a 6-single-line large bridge spanning Luohe River. It is designed to adopt the construction technique of segmental assembling with mobile bracket bridging machine from the sixth hole to the 11 th hole. In practice, the technique of integrated transverse movement of segmental assembly is used on Line-Two falsework. Some aspects of this technique such as construction scheme comparison, falsework layout, assembling, transverse moving methods as well as technical procedures are analyzed and addressed in this article.
Keywords:falsework  segmental assembly  integrated transverse movement  box beam
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号