厚层地下冰地段桥梁钻孔灌注桩基础试验研究综述 |
| |
引用本文: | 李小和,张鲁新,张先军. 厚层地下冰地段桥梁钻孔灌注桩基础试验研究综述[J]. 铁道标准设计通讯, 2002, 0(12): 28-30 |
| |
作者姓名: | 李小和 张鲁新 张先军 |
| |
作者单位: | [1]青藏铁路建设总指挥部,青海格尔木816000 [2]中铁十六局集团有限公司,北京100018 |
| |
摘 要: | ![]() 综合近 3 0年来国内工程冻土学界对多年冻土地区 ,尤其是青藏高原多年冻土区桥梁桩基研究的成果 ,评述冻土区桥梁灌注桩工作原理及承载力计算方法。结合现场桩基回冻过程地温场变化测试数据 ,对桩基承载力的影响因素、施工工艺提出建议。
|
关 键 词: | 青藏铁路 多年冻土 厚层地下冰 钻孔灌注桩 承载力 |
修稿时间: | 2002-04-10 |
A Summary of Testing Study on Cast-in-site Bored Pile in Deep Iced Ground |
| |
Abstract: | ![]() An assessment was made of working principle and bearing capacity computation of cast|in|site bored pile in permafrost zone based on summary of research achievements in recent 30 years on pile foundation at permafrost zone, especially Qinghai|Tibet Plateau by permafrost engineering circle of China. Some advice is raised about factors affecting the bearing capacity of pile foundation and construction technology based on site testing data. |
| |
Keywords: | Qinghai|Tibet Railway permafrost soil deep iced ground cast|in|site bored pile bearing capacity |