首页 | 本学科首页   官方微博 | 高级检索  
     检索      

中国南海ASDD深水试验井中的锚泊设计与作业(英文)
引用本文:郭永峰,纪少君,唐长全,李见松,钟惠泉,Ong Chin Yam Ian.中国南海ASDD深水试验井中的锚泊设计与作业(英文)[J].船舶与海洋工程学报,2012,11(2):222-227.
作者姓名:郭永峰  纪少君  唐长全  李见松  钟惠泉  Ong Chin Yam Ian
作者单位:China Oilfield Services Limited;Franklin Offshore Group of Companies in Singapore
摘    要:Mooring systems play an important role for semi-submersible rigs that drill in deepwater.A detailed analysis was carried out on the mooring of a semi-submersible rig that conducted a trial well drilling at a deepwater location in the South China Sea in 2009.The rig was 30 years old and had a shallow platform with a designed maximum operating water depth of 457 m.Following the mooring analysis,a mooring design was given that requires upgrading of the rig’s original mooring system.The upgrade included several innovations,such as installing eight larger anchors,i.e.replacing the original anchors and inserting an additional 600 m of steel wires with the existing chains.All this was done to enhance the mooring capability of the rig in order for the rig to be held in position to conduct drilling at a water depth of 476 m.The overall duration of the drilling was 50 days and the upgraded mooring system proved to be efficient in achieving the goal of keeping the rig stationary while it was drilling the trial well in the South China Sea.This successful campaign demonstrates that an older semi-submersible rig can take on drilling in deep water after careful design and proper upgrading and modification to the original mooring system.

关 键 词:offshore  anchor  operation  mooring  chain  wire  chaser  drilling  engineering  semi  submersible  South  China  Sea  anchor  handling  vessel(AHV)

Analysis and design of trial well mooring in deepwater of the South China Sea
Yongfeng Guo,Shaojun Ji,Changquan Tang,Jiansong Li,Huiquan Zhong,Ong Chin Yam Ian.Analysis and design of trial well mooring in deepwater of the South China Sea[J].Journal of Marine Science and Application,2012,11(2):222-227.
Authors:Yongfeng Guo  Shaojun Ji  Changquan Tang  Jiansong Li  Huiquan Zhong  Ong Chin Yam Ian
Institution:Yongfeng Guo1*,Shaojun Ji1,Changquan Tang1,Jiansong Li1,Huiquan Zhong1 and Ong Chin Yam Ian2 1.China Oilfield Services Limited,Beijing 101149,China 2.Franklin Offshore Group of Companies in Singapore,Singapore 609259,Singapore
Abstract:Mooring systems play an important role for semi-submersible rigs that drill in deepwater.A detailed analysis was carried out on the mooring of a semi-submersible rig that conducted a trial well drilling at a deepwater location in the South China Sea in 2009.The rig was 30 years old and had a shallow platform with a designed maximum operating water depth of 457 m.Following the mooring analysis,a mooring design was given that requires upgrading of the rig’s original mooring system.The upgrade included several innovations,such as installing eight larger anchors,i.e.replacing the original anchors and inserting an additional 600 m of steel wires with the existing chains.All this was done to enhance the mooring capability of the rig in order for the rig to be held in position to conduct drilling at a water depth of 476 m.The overall duration of the drilling was 50 days and the upgraded mooring system proved to be efficient in achieving the goal of keeping the rig stationary while it was drilling the trial well in the South China Sea.This successful campaign demonstrates that an older semi-submersible rig can take on drilling in deep water after careful design and proper upgrading and modification to the original mooring system.
Keywords:offshore  anchor operation  mooring  chain  wire  chaser  drilling engineering  semi submersible  South China Sea  anchor handling vessel(AHV)
本文献已被 CNKI SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号