首页 | 本学科首页   官方微博 | 高级检索  
     检索      

编组站综合自动化系统结构及接口问题的探讨
引用本文:李长斌,包振峰.编组站综合自动化系统结构及接口问题的探讨[J].减速顶与调速技术,2011(2):8-12.
作者姓名:李长斌  包振峰
作者单位:哈尔滨铁路局电务处;
摘    要:介绍了管、控一体编组站综合自动化系统中,区域计算机联锁的两种结构及提高可靠性、安全性的措施;在管、控一体环境下实现调机自动化子系统、尾部停车器子系统等接口设备的简化及设备结构的改造与优化。

关 键 词:编组站  自动化  子系统结构  信息接口  优化  

The Structure and Interface of Integration Automation System in Marshalling Yard
LI Chang-bin,BAO Zhen-feng.The Structure and Interface of Integration Automation System in Marshalling Yard[J].Retarders & Speed Control Technology,2011(2):8-12.
Authors:LI Chang-bin  BAO Zhen-feng
Institution:LI Chang-bin,BAO Zhen-feng (Harbin Railway Bureau Communication and Signalling Department,Harbin 150006,China)
Abstract:Introduce two structures for local computer interlocking in integrated management and control marshalling yard in integration automation system,along with measures for improving the reliability and safety;achiving simplified interface devices for shunting locomotive automation subsystem and stopping implements subsystem in integrated management and control environment as well as device structure reformation and optimization.
Keywords:marshalling yard  automation  subsystem structure  information interface  optimize  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号