首页 | 本学科首页   官方微博 | 高级检索  
     

武广客运专线路基过渡段填筑工艺
引用本文:刘新林. 武广客运专线路基过渡段填筑工艺[J]. 铁道建筑技术, 2009, 0(1): 167-169
作者姓名:刘新林
作者单位:中铁十二局集团第一工程有限公司,江苏苏州,215151
摘    要:武广客运专线采用无砟轨道形式,对结构物工后沉降提出了较高的要求。结合工程实例,介绍武广客运专线路基过渡段填筑的材料选择和施工工艺,以高效、保质、低成本完成施工任务。

关 键 词:客运专线  过渡段  填筑

Filling Techniques for the Roadbed Transitional Sections in Wu-guang PDL
Liu Xinlin. Filling Techniques for the Roadbed Transitional Sections in Wu-guang PDL[J]. Railway Construction Technology, 2009, 0(1): 167-169
Authors:Liu Xinlin
Affiliation:Liu Xinlin (China Railway 12^th Bureau Group Co. Ltd. , Taiyuan 030024, China)
Abstract:Adopting the ballastless track, Wu-guang PDL raises a high requirement for structure' s settlement. Combined with the real project practice, this paper introduces the material selection and construction techniques of roadbed transitional section filling in Wu-guang PDL, to ensure the accomplishment of construction in an effective, high-quality and low- cost way.
Keywords:passenger dedicated line  transitional section  filling
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号