首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Dynamic response analysis of towed cable during deployment/retrieval
Authors:Fei Wang  Guo-liang Huang  De-heng Deng
Institution:1. Merchant Marine College,Shanghai Maritime University,Shanghai 200135,China;State Key Laboratory of Ocean Engineering,Shanghai Jiaotong University,Shanghai 200240,China
2. State Key Laboratory of Ocean Engineering,Shanghai Jiaotong University,Shanghai 200240,China
Abstract:A numerical approach was developed to analyze the transient behavior of towed cable during ac- tively controlled deployment/retrieval (DR). The cable motion is described by the lumped parameter method, its corresponding boundary conditions are presented. In view of its varying length during DR, two auxiliary arguments are introduced to describe its continuous varying length and discrete number of nodes(equations), the length is determined by the pay out(or reel-in) rate, which is then used to determine the node number by a logic relation. For the discrete mathematical model of towed cable, an algorithm was developed to deal with the discrete governing equations. The simulation results indicate that the cable experiences more com- plex motions due to its varying length, and tension fluctuates seriously in the startup and ending stage of deployment/retrieval. The effect of towing ship's motion in waves on cable during deployment/retrieval is also considered via numerical simulation.
Keywords:towed cable  boundary conditions  deployment/retrieval  numerical simulation
本文献已被 维普 万方数据 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号