浅谈铁路隧道的排水措施及费用分析
引用本文:常宏,刘田明. 浅谈铁路隧道的排水措施及费用分析[J]. 铁路工程造价管理, 2001, 16(2): 25-26,30
作者姓名:常宏  刘田明
作者单位:1. 铁三院工经处
2. 朔黄铁路有限责任公司计划合同部
摘    要:在隧道工程施工过程中的涌水量是设计过程中无法具体量化的.制订合理的隧道施工排水方案,是进行费用分析的基础,并在施工阶段的工程造价管理中有着重要的作用.此文以某线某隧道的施工排水为例,进行具体的费用分析.

关 键 词:隧道工程  排水措施  费用分析
修稿时间:2000-10-30

Discussion on drainage measures and cost analysis of railway tunnels
Chang Hong,Liu Tian ming. Discussion on drainage measures and cost analysis of railway tunnels[J]. Railway Engineering Cost Management, 2001, 16(2): 25-26,30
Authors:Chang Hong  Liu Tian ming
Affiliation:Chang Hong and Lin Tian ming
Abstract:Upwellings happened during tunnel construction cannot be quantized in course of design . It will form the basis of cost analysis to institute reasonable drainage scheme in tunnel construction, which also plays an important role in the engineering cost control of construction stage. This paper, taking the construction drainage of a certain tunnel for example, conducts a specific cost analysis on the same.
Keywords:Tunnel engineering   drainage measure   cost analysis