首页 | 本学科首页   官方微博 | 高级检索  
     检索      

资源紧缺型集装箱码头多类型场桥配置问题研究
引用本文:檀财茂,黄有方,何军良,严伟,于航.资源紧缺型集装箱码头多类型场桥配置问题研究[J].交通运输系统工程与信息,2016,16(1):229-236.
作者姓名:檀财茂  黄有方  何军良  严伟  于航
作者单位:上海海事大学a. 科学研究院;b. 物流工程学院;c. 经济管理学院,上海201306
摘    要:针对资源紧缺型集装箱码头场桥配置特点,探索堆场场桥配置问题.使用运筹 学线性规划方法,建立集装箱码头堆场场桥配置混合整数规划模型,模型能够处理码头 多类型场桥配置问题.数值实验部分,结合港口实际情况设计算例验证模型的有效性,同 时对模型进行较为完整的场景分析,包括初始场桥分配、场桥作业性能及场桥资源数量, 指出其对实际堆场管理的意义.实验结果显示,本文建立的场桥配置问题能够较好地解决 资源紧缺型集装箱码头场桥配置问题,为实际港口操作提供决策支持.

关 键 词:水路运输  集装箱码头优化  多类型  混合整数规划  资源紧缺  
收稿时间:2015-09-14

Multi-type Crane Deployment Problem for Resource Limited Container Terminals
TAN Cai-maoa,HUANG You-fanga,HE Jun-liangb,YANWeib,YU Hangc.Multi-type Crane Deployment Problem for Resource Limited Container Terminals[J].Transportation Systems Engineering and Information,2016,16(1):229-236.
Authors:TAN Cai-maoa  HUANG You-fanga  HE Jun-liangb  YANWeib  YU Hangc
Institution:a. Scientific Research Academy; b. Logistics Engineering Collage; c. School of Economics and Management, Shanghai Maritime University, Shanghai 201306, China
Abstract:This paper researches on the yard crane deployment problem in most Asian container ports. A mixed integer programming is built by using linear programming method. This model can solve the multitype yard crane deployment problem well. In numerical experiments, a simper case is designed to test the model reliability and accuracy, and analyzes a set of scenarios such as initial yard crane allocation, yard crane performance and yard crane number. It points out many management meanings in container terminal practical operation. Experiments results show that the proposed model can deal with multi-type yard cranes deployment problem in Asian port terminals and can provide decision support for terminal manager.
Keywords:waterway transportation  container terminal optimization  multi-type crane deployment  mixed integer programming  resource limited  
点击此处可从《交通运输系统工程与信息》浏览原始摘要信息
点击此处可从《交通运输系统工程与信息》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号