首页 | 本学科首页   官方微博 | 高级检索  
     检索      

港珠澳大桥建设对水沙环境影响数学模型研究—I. 模型的建立和验证
引用本文:李文丹,李孟国,杨树森,王晨阳.港珠澳大桥建设对水沙环境影响数学模型研究—I. 模型的建立和验证[J].水运工程,2011(8):1-8.
作者姓名:李文丹  李孟国  杨树森  王晨阳
作者单位:1. 交通运输部天津水运工程科学研究所工程泥沙交通行业重点实验室,天津,300456
2. 长沙理工大学,湖南长沙,410076
摘    要:针对港珠澳大桥工程和其所在海区的特点,基于TK-2D软件建立了不规则三角形网格的伶仃洋内外海域大范围二维潮流泥沙数学模型和大桥工程区附近的小范围局部细化的二维潮流泥沙数学模型,根据现场实测资料对模型进行了充分的验证,分析了工程海区的潮流悬沙特征,为进一步论证港珠澳大桥建设方案对工程海区的影响奠定了基础。

关 键 词:港珠澳大桥  泥沙  潮流  数学模型  数值模拟  TK-2D软件  伶仃洋

Mathematical modeling of the effect of constructing Hongkong-Zhuhai-Macao bridge on hydrodynamic sediment environment: I. Development and verification of the model
LI Wen-dan,LI Meng-guo,YANG Shu-sen,WANG Chen-yang.Mathematical modeling of the effect of constructing Hongkong-Zhuhai-Macao bridge on hydrodynamic sediment environment: I. Development and verification of the model[J].Port & Waterway Engineering,2011(8):1-8.
Authors:LI Wen-dan  LI Meng-guo  YANG Shu-sen  WANG Chen-yang
Institution:1. Tianjin Research Institute of Water Transport Engineering, Key Laboratory of Engineering Sediment of Ministry of Transport,Tianjin 300456, China; 2. Changsha University of Science and Technology, Changsha 410076, China
Abstract:According to the feature of the project and the sea area, by TK-2D software and with irregular triangular grid, an integral mathematical model and a local refined one near project area of tidal current and sediment in Lingdingyang bay are set up. Verification and validation are carried out fully against measured data and numerical simulations of tidal current and suspended sediment field are made. The features of the tidal current field and the suspended sediment field of the Lingdingyang bay area are analyzed and the basis is established to demonstrate the effect of constructing Hongkong-Zhuhai-Mocao bridge on the sea area.
Keywords:Hongkong-Zhuhai-Macao bridge  sediment tidal current  mathematical model  numerical
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号