暗挖隧道过既有建筑物采用隔离桩法施工分析
引用本文:贾喜涛.暗挖隧道过既有建筑物采用隔离桩法施工分析[J].隧道建设,2006,26(1):25-26,101.
作者姓名:贾喜涛
作者单位:中隧集团北京分公司,北京,100022
摘    要:暗挖出入口隧道与既有建筑相距近,为保证既有结构安全采用隔离桩法施工。文章通过数值模拟分析计算,比较隧道与建筑物之间不设隔离桩和设隔离桩两种工况下施工完成后和各阶段的沉降量,得出设隔离桩是可行的的结论。

关 键 词:既有结构隔离桩计算分析
收稿时间:2005-06-07
修稿时间:2005-06-07

Analysis on Application of Isolation Piles in Construction of Mined Tunnels Underneath Existing Buildings
JIA Xi-tao.Analysis on Application of Isolation Piles in Construction of Mined Tunnels Underneath Existing Buildings[J].Tunnel Construction,2006,26(1):25-26,101.
Authors:JIA Xi-tao
Institution:Beijing Branch of China Railway Tunnel Group Co. ,Ltd. , Beijing 100022, China
Abstract:Due to the short distance between the mined exit/entrance tunnel and the existing buildings, isolation piles are installed during the tunnel construction so as to ensure the safety of the existing buildings. By means of numerical simulations, analysis and calculations, the article makes a comparison of the settlement value after construction and that during each construction stage under two different working conditions, i. e. , condition with isolation piles being installed between the tunnel and the existing buildings and condition with isolation piles being not installed, and draws a conclusion that installing isolation piles is a feasible solution.
Keywords:existing building  isolation pile  computation analysis