首页 | 本学科首页   官方微博 | 高级检索  
     检索      

涪陵五中后山滑坡成因分析及工程治理
引用本文:张俊德,张志强.涪陵五中后山滑坡成因分析及工程治理[J].路基工程,2010,0(5):192-194.
作者姓名:张俊德  张志强
作者单位:中铁西北科学研究院有限公司730000
摘    要:涪陵五中后山滑坡为一顺层岩石滑坡,滑坡滑动堵塞了319国道,严重影响到涪陵等地的对外交通,社会影响巨大。设计采用上部清方,下部设置抗滑桩、锚索框架等支挡工程进行综合治理,取得了很好效果。其成功经验对于城区滑坡的治理,尤其是大型顺层岩石滑坡的治理很有借鉴意义。

关 键 词:涪陵    顺层岩石滑坡    成因分析    工程治理
收稿时间:2019-11-08

Causes Analysis and Engineering Treatment of Back Mountain Landslide of Fuling No.5 Middle School
Authors:ZHANG Jun-de  ZHANG Zhi-qiang
Institution:(Northwest Research Institute Co.,Ltd.,of C.R.E.C,Lanzhou 730000,China)
Abstract:Fuling No.5 Middle School back mountain landslide is of consequent rock landslide,which blocks 319 national highway,seriously influencing transportation to and from Fuling with huge social influence.Comprehensive treatment measures haven been taken such as clearing earthwork in upper part and setting anti-slide pile and anchor cable frame in lower part,achieving good effect.Its successful experience can be reference for urban landslide treatment,especially large-scale consequent rock landslide.
Keywords:Fuling  consequent rock landslide  cause analysis  engineering treatment
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《路基工程》浏览原始摘要信息
点击此处可从《路基工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号