首页 | 本学科首页   官方微博 | 高级检索  
     检索      

港口开发建设对田湾核电站取水工程的影响
引用本文:李孟国,李文丹,李世森.港口开发建设对田湾核电站取水工程的影响[J].中国港湾建设,2007(1):23-26.
作者姓名:李孟国  李文丹  李世森
作者单位:1. 交通部天津水运工程科学研究所,工程泥沙交通行业重点实验室,天津,300456
2. 交通部天津水运工程科学研究所,工程泥沙交通行业重点实验室,天津,300456;哈尔滨工程大学船舶工程学院,黑龙江,哈尔滨,100051
3. 天津大学建筑工程学院,天津,300072
摘    要:建立了基于不规则三角形网格潮流泥沙数学模型,在对模型进行充分验证的基础上,对连云港港口扩建(旗台港区建设)规划方案和埒子口港区规划对田湾核电站已建取水工程的影响进行了数值模拟研究,计算了取水口附近滩面的冲淤变化和等深线位移。研究结果表明:连云港港口扩建及埒子口港区规划实施后,已建的田湾核电站取水明渠口门附近水域变成泥沙淤积环境,滩面将会淤高,设计的取水口门水深等深线将会外移,核电站正常取水将会受到影响。

关 键 词:连云港港  田湾核电站  泥沙  潮流  数学模型  数值模拟
文章编号:1003-3688(2007)01-0023-04
修稿时间:2006-11-07

Numerical modeling of tidal current and sediment movement in coastal area near Tianwan Nuclear Power Statiom
LI Meng-guo,LI Wen-dan,LI Shi-sen.Numerical modeling of tidal current and sediment movement in coastal area near Tianwan Nuclear Power Statiom[J].China Harbour Engineering,2007(1):23-26.
Authors:LI Meng-guo  LI Wen-dan  LI Shi-sen
Institution:1. Tianjin Research Institute of Water Transport Engineering, Key Laboratory of Engineering Sediment of Ministry of Communications, Tianjin 300456, China; 2. School of Shipbuilding Engineering, Harbin Engineering University, Harbin 150001, China; 3. School of Civil Engineering, Tianjin University, Tianjin 300072, China
Abstract:Mathematical models of tidal current, sediment movement and seabed erosion and deposition are set up with irregular triangular grids. On the basis of full validation and verification of the models, the impacts of the extension project plan(Qitai harbour construction plan)of Lianyungang Port and Liezikou harbor on the constructed water intake project of Tianwan Nuclear Power Station are numerically studied, and the seabed erosion and disposition near the water intake and the displacement of the water intake isobath are calculated. The study results show that the coastal waters near the water intake will become a sediment deposit-promoting environment, the seabed will rise and the isobath at water intake will move outward after the construction of Lianyungang Port's extension project and Liezikou harbor project, and the water intake of Tianwan Nuclear Power Station will not be able to work regularly.
Keywords:Lianyungang Port  Tianwan Nuclear Power Station  sediment  tidal current  mathematical model  numerical modeling
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号