首页 | 本学科首页   官方微博 | 高级检索  
     检索      

车站有源应答器报文延迟问题情况分析
引用本文:刘鸿飞.车站有源应答器报文延迟问题情况分析[J].铁道通信信号,2012,48(9):17-19.
作者姓名:刘鸿飞
作者单位:北京全路通信工程信号研究设计院有限公司,北京,100073
摘    要:随着我国高速铁路的快速发展,列控系统得以迅速推广实施。列控中心在发送报文时,会存在多种原因的延迟,使在进路改变、点灯和轨道区段发码状态改变、临时限速改变的情况下,有源应答器报文没有更新。为此针对不同类型有源应答器的报文延迟对列车实际运行带来的影响进行分析。

关 键 词:延迟  有源应答器  报文

Analysis of Message Latency Issues in Active Balise at Station
Liu Hongfei.Analysis of Message Latency Issues in Active Balise at Station[J].Railway Signalling & Communication,2012,48(9):17-19.
Authors:Liu Hongfei
Institution:Liu Hongfei
Abstract:With the rapid development of high speed railways in China, the train control systems have been widely applied. There are delays caused by many reasons when the TCC sends telegrams and the telegram from active balise may not be updated in case of the routes being changed, lighting, the status of track circuit sending code being changed as well as TSR being changed. This paper will analyze the influ- ence of the telegram delay on the train operation.
Keywords:Delay  Switch balise  Telegram
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号