首页 | 本学科首页   官方微博 | 高级检索  
     检索      

大型内河沉管节段全断面预制施工技术
引用本文:刘轩源,许兆勇.大型内河沉管节段全断面预制施工技术[J].港工技术,2020(3):83-86.
作者姓名:刘轩源  许兆勇
作者单位:中交四航局第二工程有限公司
摘    要:沉管隧道节段全断面预制是沉管施工技术发展创新的起点,能提高控裂性能,提升整体式管节预制品质,加快施工进度,同时裂缝的减少能降低运营期维护费用。本文从沉管分段设计、模板体系及BIM技术的应用介绍了车陂沉管隧道节段全断面预制施工技术。

关 键 词:沉管  全断面  BIM

Full-section Precast Technology Applied in Construction of Large-size Immersed Tube in Inland River
Liu Xuanyuan,Xu Zhaoyong.Full-section Precast Technology Applied in Construction of Large-size Immersed Tube in Inland River[J].Port Engineering Technology,2020(3):83-86.
Authors:Liu Xuanyuan  Xu Zhaoyong
Institution:(The Second Engineering Company of CCCC Fourth Harbor Engineering Co.,Ltd.,Guangzhou Guangdong 510230,China)
Abstract:The full-section precast technology for the immersed tunnel represents the development and innovation of immersed tube construction.Its application can control concrete cracks effectively,improve the quality of integrally precast tube,speed up the construction progress,and reduce the maintenance cost in operation period due to the decrease of cracks.An introduction to the full-section precast technology of Chebei immersed tunnel is made,including the design-by-section of immersed tube,mould system and BIM application.
Keywords:immersed tube  full section  BIM
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号