首页 | 本学科首页   官方微博 | 高级检索  
     检索      

多因素作用下隧道衬砌内力随时间变化规律
引用本文:徐凌,黄宏伟.多因素作用下隧道衬砌内力随时间变化规律[J].隧道建设,2010,30(3):238-241.
作者姓名:徐凌  黄宏伟
作者单位:1. 北京市轨道交通建设管理有限公司,北京100037; 2. 同济大学地下建筑与工程系, 上海200092
摘    要:针对隧道初期支护和二次衬砌施作间隔时间短的工程特点,为掌握类似条件下衬砌受力变化的规律,分析二次衬砌钢筋轴力监测数据及相应的施工工况,研究隧道开挖、围岩蠕变、隧道衬砌刚度等因素对二次衬砌钢筋轴力变化的影响,如二次衬砌钢筋轴力变化曲线可分为2个明显的双曲线变化阶段:第一阶段主要受隧道开挖和隧道衬砌刚度的影响,围岩蠕变明显,在其作用下二次衬砌钢筋轴力明显增加,且轴力变化至少在1年后才趋于稳定,第一阶段大约持续33d,此阶段隧道衬砌刚度基本形成,而后二次衬砌钢筋变化进入第二阶段;第二阶段变化主要受围岩蠕变的影响。

关 键 词:隧道衬砌  二次衬砌钢筋轴力  时效性规律  监测数据  
收稿时间:2010-03-01
修稿时间:2010-05-18

Study on Time-dependent Variation Rules of Internal Force of Tunnel Lining under Influence of Several Factors
XU Ling,HUANG Hongwei.Study on Time-dependent Variation Rules of Internal Force of Tunnel Lining under Influence of Several Factors[J].Tunnel Construction,2010,30(3):238-241.
Authors:XU Ling  HUANG Hongwei
Institution:1. Beijing MRT Construction Administration Corp., Beijng 100037, China;
2. Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China
Abstract:The secondary lining of the mentioned tunnel is cast shortly after the installation of the preliminary lining. In order to investigate the variation rules of the internal force of the tunnel lining, the influence of tunnel excavation, surrounding rock mass creeping and tunnel lining rigidity on the axial force of the re-bars in the secondary lining is studied on basis of the axial force monitoring records and construction records. The variation of the axial force of the re-bars in the secondary lining can be divided into two stages, which meet the hyperbolic rule. In the first stage, the variation of the axial force of the re-bars in the secondary lining is mainly affected by the tunnel excavation and the lining rigidity. The axial force increases significantly and reaches stable in one year because of the significant creeping of the surrounding rock mass. The first stage lasts for 33 days before the rigidity of the tunnel lining is formed. Then the variation of the axial force enters the second stage. In the second stage, the variation of the axial force of the re-bars in the secondary lining is mainly affected by the creeping of the surrounding rock mass.
Keywords:tunnel lining  axial force of re bar in secondary lining  time dependent rule  monitoring records
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号