拱北隧道曲线管幕工程关键施工技术分析
引用本文:李同安.拱北隧道曲线管幕工程关键施工技术分析[J].路基工程,2015,0(6):144-147.
作者姓名:李同安
作者单位:中铁十八局集团有限公司, 天津 300222
摘    要:拱北隧道管幕工程所处地层地质条件复杂,周边环境敏感,管幕由缓和曲线与圆曲线组成,要求精准顶进,形成管幕,施工难度大。经过分析,采用泥水平衡顶管施工、顶管轨迹控制及纠偏等关键技术用于拱北隧道曲线管幕工程的顶管施工,取得了良好的效果。

关 键 词:港珠澳大桥    曲线管幕工程    泥水平衡顶管施工    顶管轨迹控制及纠偏    地表沉降控制
收稿时间:2019-11-12

Analysis on Key Construction Technology for Curve Pipe Roofing Project of Gongei Tunnel
Abstract:Curve Pipe Roofing Project of Gongbei Tunnel is the control project. The geological condition of pipe roofing is complicated and the surrounding environment is sensitive. The pipe roofing is composed of transition curve and circular curve, which requires accurate roofing to form pipe roofing with great construction difficulties. Through analysis, key technologies like mud-water balance pipe-jacking, pipe-jacking trajectory control and deviation rectification, etc. are adopted for the pipe-roofing construction of curve pipe-roofing project of Gongbei Tunnel, which obtains good effect.
Keywords:
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《路基工程》浏览原始摘要信息
点击此处可从《路基工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号