首页 | 本学科首页   官方微博 | 高级检索  
     检索      

公路施工准备阶段的测量工作探讨
引用本文:阿米娜古丽·艾则孜.公路施工准备阶段的测量工作探讨[J].交通标准化,2012(12):159-160.
作者姓名:阿米娜古丽·艾则孜
作者单位:新疆林业规划设计院,新疆乌鲁木齐,830000
摘    要:近年来,公路建设快速向前发展.然而在我国山区高等级公路施工过程中,准备阶段的测量工作存在着种种不合理的现象,延误工程项目的施工进度,造成不必要的经济损失.对公路工程项目施工准备阶段的测量工作进行探讨,可为同类工程提供一定的参考.

关 键 词:项目施工  准备阶段  测量

Surveying Work in Preparation Stage of Highway Construction
Aminaguli· Aizezi.Surveying Work in Preparation Stage of Highway Construction[J].Communications Standardization,2012(12):159-160.
Authors:Aminaguli· Aizezi
Institution:Aminaguli·Aizezi (Xinjiang Forestry Planning & Design Institute, Urumqi 830000, China)
Abstract:In recent years, highway construction has developed rapidly. However, in construction stage of high-grade highway in mountain areas, unreasonable phenomena exist widely in surveying work at preparation stage, which leads to construction progress delay of engineering project and economic losses. Surveying work at preparation stage in engineering project is explored in this paper, which provides a certain reference for similar project.
Keywords:project construction  preparation stage  survey
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《交通标准化》浏览原始摘要信息
点击此处可从《交通标准化》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号