首页 | 本学科首页   官方微博 | 高级检索  
     检索      

JQ900A型架桥机通过万宁2号拱桥方案研究
引用本文:刘林生.JQ900A型架桥机通过万宁2号拱桥方案研究[J].石家庄铁道学院学报,2010(4):95-99,103.
作者姓名:刘林生
作者单位:中铁十九局集团第五工程有限公司,辽宁大连116000
摘    要:介绍了万宁2号特大桥上JQ900A架桥机和KSC900运梁车过桥施工方案,采用结构分析程序对主梁的结构受力进行分析,计算了不同工况下主梁顶板、底板的应力,计算分析结果表明:抗裂安全系数均大于1.1,最大弯矩处的截面强度安全系数大于2.2,过桥方案是合理可行的。

关 键 词:系杆拱桥  架桥机  施工方案  结构分析

Study on JQ900A Bridge Construction Machine Passing Tied Arch in Wanning 2nd Bridge
Liu Linsheng.Study on JQ900A Bridge Construction Machine Passing Tied Arch in Wanning 2nd Bridge[J].Journal of Shijiazhuang Railway Institute,2010(4):95-99,103.
Authors:Liu Linsheng
Institution:Liu Linsheng(Fifth Engineering Company, 19th China Railway Bureau Group, Dalian 116000, China )
Abstract:The bridge machine JQgOOA and the transporting girder vehicle KSC900 passing the Wanning 2nd super large bridge is introduced. The structural behavior is analyzed with Sap2000 and Midas/Civil, and the stress of the top and bottom flange of main beam is calculated. The calculation results show that, under every load condition, the anti-cracking safety factors are all lager than 1.1, and the strength safety factors at the maximum bending moment are all lager than 2.2, which indicates that the project is reasonable and feasible.
Keywords:tied arch bridge  bridge machine  construction project  structural analysis
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号