首页 | 本学科首页   官方微博 | 高级检索  
     检索      

城市轨道交通预制H型板柱组合轨道结构的研究与设计
引用本文:段玉振,吴建忠,刘 观,陈应东.城市轨道交通预制H型板柱组合轨道结构的研究与设计[J].都市快轨交通,2022,35(2):124-129.
作者姓名:段玉振  吴建忠  刘 观  陈应东
作者单位:北京城建设计发展集团股份有限公司,北京100037;北京市轨道结构工程技术研究中心,北京100037;城市轨道交通绿色与安全建造技术国家工程实验室,北京100037,中铁城市发展投资集团有限公司,成都610031
摘    要:目前,城市轨道交通车场停车库内立柱检查坑的立柱基本采用现浇混凝土结构形式,少数采用钢立柱或者预制混凝土小立柱结构.常规立柱方案存在施工作业环节多、施工精度不易控制、施工进度缓慢、施工质量不易控制等问题,难以满足城市轨道交通施工工期、施工精度、美观性要求.系统调研了常规现浇混凝土立柱方案、钢立柱方案、预制混凝土小立柱方案...

关 键 词:城市轨道交通  混凝土立柱  预制  板柱组合轨道结构

Research and Design of Prefabricated H-shaped Slab-Column Combined Track Structure for Urban Rail Transit
DUAN Yuzhen,WU Jianzhong,LIU guan,CHEN Yingdong.Research and Design of Prefabricated H-shaped Slab-Column Combined Track Structure for Urban Rail Transit[J].Urban Rapid Rail Transit,2022,35(2):124-129.
Authors:DUAN Yuzhen  WU Jianzhong  LIU guan  CHEN Yingdong
Institution:Beijing Urban Construction Design & Development Group Co., Ltd.,Beijing Engineering Research Center of Track Structure,National Engineering Laboratory of Green and Safe Construction Technology for Urban Rail Transit
Abstract:At present, the columns of column inspection pits in the parking garage of urban rail transit depots adopt the form of cast-in-place concrete structures, and a few adopt steel structures, columns, or precast concrete small column structures. Conventional column schemes have many construction operations, progress is slow, and accuracy and quality are difficult to control. It is difficult to meet the requirements of the construction period, construction precision, and aesthetics of urban rail transit. In this study, the advantages and disadvantages of the conventional cast-in-place concrete column, steel column, and precast concrete small column schemes were systematically investigated with respect to design, construction precision control, construction quality control, engineering cost, and a precast H-shaped slab and column composite track structure scheme was developed. Compared with the conventional scheme, this scheme has the characteristics of simplifying operation links, reducing labor intensity, improving construction accuracy and efficiency, and enhancing its aesthetics, and realizes thestructural assembly to the greatest extent, providing a good reference for solving the problems related to the inspection pit structure of the columns in the car depot parking garage.
Keywords:urban rail transit  concrete column  precast  slab-column combined track structure
本文献已被 万方数据 等数据库收录!
点击此处可从《都市快轨交通》浏览原始摘要信息
点击此处可从《都市快轨交通》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号