摘 要: | 近年来,国内外对大变形段隧道在设计、施工技术方面的研究取得了一定的成果,例如兰渝、拉林等铁路项目均对高地应力大变形进行了研究,铁建设〔2007〕155号文也针对施工降效明确了定额增加幅度系数.但是在定额测定的过程中,由于隧道工程施工的复杂性和综合性,所需的施工组织模型原始现场数据数量极大,算数平均等方法求解的消耗量会因...
|
关 键 词: | 大变形隧道 浮动平均 R语言编程 定额测定 |
Application of Floating Average Value in Quota Determinationand Analysis of Large Deformation Tunnel |
| |
Authors: | LI Zhun ZHANG Qiong |
| |
Institution: | (China Railway Eryuan Engineer Group,Co.,Ltd.,Chengdu 610031,China) |
| |
Abstract: | In recent years,the studies on design and construction technology of tunnels with large deformation in China and abroad have achieved certain results.For example,Lanzhou-Chongqing Railway,Lhasa-Nyingchi Railway and other railway projects have all involved the study on the large deformation due to high geo-stress,and the document TJS2007]No.155 has also defined the coefficient of quota increase range for the construction efficiency reduction.However,in the process of quota determination,due to the complexity and comprehensiveness of tunnel construction,the original field data of the required construction organization model is extensive,and the consumption calculated by the arithmetic average method will be deviated or abnormal due to unavoidable factors such as the change of construction environment.This paper introduces the method of calculating the floating average with R programming,and makes secondary process and optimization for the realistic data based on the study results to effectively improve the accuracy and stability of the data. |
| |
Keywords: | tunnel with large deformation floating average R programming quota determination |