首页 | 本学科首页   官方微博 | 高级检索  
     

大体积连续箱梁混凝土冬季施工技术
引用本文:杨增辉. 大体积连续箱梁混凝土冬季施工技术[J]. 交通标准化, 2010, 0(9): 65-68. DOI: 10.3869/j.1002-4786.2010.05.016
作者姓名:杨增辉
作者单位:邢台路桥建设总公司,河北,邢台,054001
摘    要:
通过总结大体积连续箱梁冬季施工技术方案制定和实施的成功经验,全面介绍箱梁冬季施工的控制指标、热工计算以及保证措施,对于类似工程的冬季施工具有一定的指导意义。

关 键 词:大体积箱梁  混凝土  冬季施工

Winter Construction Technology of Massive Continuous BOX Girder
YANG Zeng-hui. Winter Construction Technology of Massive Continuous BOX Girder[J]. Communications Standardization, 2010, 0(9): 65-68. DOI: 10.3869/j.1002-4786.2010.05.016
Authors:YANG Zeng-hui
Affiliation:Xingtai Highway & Bridge Construction General Corporation/a>;Xingtai 054001/a>;China
Abstract:
By summarizing the successful experience of massive box girder's winter construction technology,the control indexes,heat engineering calculation and guarantee measures of box girder's winter construction are introduced completely,which has a certain guidance significance to the winter construction of similar engineering.
Keywords:massive box girder  concrete  winter construction  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号