首页 | 本学科首页   官方微博 | 高级检索  
     检索      

浅析无砟轨道隧道的综合接地设计
引用本文:段伟.浅析无砟轨道隧道的综合接地设计[J].铁道建筑技术,2009(12):96-98.
作者姓名:段伟
作者单位:铁道部宜万铁路建设指挥部,湖北恩施,445600
摘    要:以宜万铁路无砟轨道上的接地设置为例,从接地的目的、原则、要求和措施等方面阐述了综合接地系统对于保证无砟轨道隧道结构本身、人员、设备和列车安全运行的重要作用。

关 键 词:综合接地设计  无砟轨道  隧道

Study on the Comprehensive Earthing System Design for Ballastless Track in Tunnel
Duan Wei.Study on the Comprehensive Earthing System Design for Ballastless Track in Tunnel[J].Railway Construction Technology,2009(12):96-98.
Authors:Duan Wei
Institution:Duan Wei (Yi-Wan Railway Construction Headquarter, China Ministry of Railways, Enshi 445600, China)
Abstract:This paper takes the example of comprehensive earthing system settings in ballastless track of Yi - Wan Railway, and elaborates the importance of comprehensive earthing system for protecting the tunnel structures of the ballastless track and the security of people, equipment and trains operation in terms of the purpose, principles, requirements and measures of the system.
Keywords:comprehensive earthing system design  ballastless track  tunnel
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号