首页 | 本学科首页   官方微博 | 高级检索  
     检索      

顶推钢导梁与主梁新型连接方式研究
作者单位:;1.湖南中大设计院有限公司;2.湖南高速铁路职业技术学院
摘    要:常规顶推施工中钢导梁与主梁多采用精轧螺纹钢连接方式。由于某铁路桥主梁腹板厚度较薄、导梁与主梁高度不相匹配,采用常规的连接方式难以满足受力的需要。为解决这一难题,对常规顶推方案进行改进与创新,提出一种剪力分配梁与水平向精轧螺纹钢相结合的新型连接方式,方便地解决了工程实际需求。实践证明,该连接方式操作简单、适用性强。该方案的成功运用可以作为类似跨线桥(跨铁路、公路等)顶推施工导梁连接方案的借鉴。

关 键 词:铁路桥梁  精轧螺纹钢  剪力分配梁  顶推施工  导梁连接

Research on New Type of Connection between Launching Nose and Main Girder
Institution:,Hu'nan Zhongda Design Institute Co.,Ltd.,Hu'nan Technical College of Railway High-speed
Abstract:The screw-thread steel bar is often used for the connection between launching nose and main girder in typical incremental launching process. Because the thickness of the web plate is thin and the launching nose is not matched with the height of the girder,it is difficult to meet the needs of incremental launching construction by using conventional screw-thread steel bar connection method. To solve this problem,this paper presents a new method of connection by combining shear force distribution beam with horizontal screw-thread steel bars. The practice proves that the connection is simple and applicable. The successful application provides good and meaningful references for the launching nose connection of other similar flyovers( crossing over railway and highway).
Keywords:Railway bridge  Screw-thread steel bar  Shear force distribution beam  Incremental launching  Launching nose connection
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号