6200车位滚装船汽车绑扎件安装分析 |
| |
引用本文: | 柳慰林,刘宇,张新.6200车位滚装船汽车绑扎件安装分析[J].船海工程,2013(5):52-54. |
| |
作者姓名: | 柳慰林 刘宇 张新 |
| |
作者单位: | 南通中远川崎船舶工程有限公司,江苏南通226500 |
| |
摘 要: | 分析6200车位滚装船汽车绑扎件在安装阶段存在的问题,研讨对策并提出改进方案.通过比较改进方案前后的数据,验证该方案的有效性.该方案实现了节约材料、能源,减少现场作业工时,可提高现场综合施工效率.
|
关 键 词: | 汽车绑扎件 安装阶段 改进 |
On the Installation of Lashing Piece for Cars of the 6200 Pure Car Carrier |
| |
Authors: | LIU Wei-lin LIU Yu ZHANG Xin |
| |
Institution: | (Nantong COSCO KHI Ship Engineering Company Limited, Nantong Jiangsu 226005, China) |
| |
Abstract: | The problems existing in the fitting stage of installation of lashing piece for cars fitted in the 6 200 pure car carrier were analyzed to set forth the improving scheme. The improving scheme was verified by the practical data, which can save con- sumption of material and energy sources, reduce the spot man-haur and increase integrative efficiency of construction. |
| |
Keywords: | lashing piece for cars fitting stage optimize |
本文献已被 维普 等数据库收录! |