首页 | 本学科首页   官方微博 | 高级检索  
     检索      

城市轨道交通车站综合接地装置及其施工要点
引用本文:郭润桥.城市轨道交通车站综合接地装置及其施工要点[J].电气化铁道,2008(5):47-50.
作者姓名:郭润桥
作者单位:北京交通大学,北京,100044
摘    要:介绍了城市轨道交通车站综合接地装置的施工工艺和要点,并将几种接地装置用材及焊接施工方法进行了比较,指出采用铜排、铜包钢接地极和热熔焊接方式进行综合接地装置安装的先进性和必要性,并简要介绍了热熔焊接方式的原理、操作方法及注意事项.

关 键 词:城市轨道交通  综合接地  施工  热熔焊

Station Integrated Earthing Device and Construction Key Points for Urban Rail Transportation
Guo Runqiao.Station Integrated Earthing Device and Construction Key Points for Urban Rail Transportation[J].Electric Railway,2008(5):47-50.
Authors:Guo Runqiao
Abstract:Introduces the construction procedure and means of the integrated grounding fitting of the city metro station,and compares the material selecting and the means of weld about several grounding fittings,indicates that is advanced and necessary to use flat cuprum,steel grounding pole covered with cuprum and melting weld in construction for integrated grounding fitting,then explain the principle,means and something must be paid attention in operating of melting weld.
Keywords:city metro  integrated grounding  construction  melting weld  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号