锦屏水电站引水隧洞岩爆施工技术探讨
引用本文:王白山.锦屏水电站引水隧洞岩爆施工技术探讨[J].铁道建筑技术,2011(7):99-101,107.
作者姓名:王白山
作者单位:中铁十八局集团公司隧道工程公司 天津300222
摘    要:锦屏二级水电站引水隧洞工程埋深大,地应力高。在采用钻爆法施工中碰到了高地应力导致的岩爆问题,对施工进度、设备和人员安全影响较大。在施工过程中总结岩爆发生规律,对其进行了一定的探索。通过多种形式的现场试验,总结了防治岩爆的施工方法及措施。

关 键 词:水电站  引水隧洞  岩爆规律  施工技术

Discussion on the Construction Technique for Jinping Hydropower Station Headrace Tunnel Rock-burst
Wang Baishan.Discussion on the Construction Technique for Jinping Hydropower Station Headrace Tunnel Rock-burst[J].Railway Construction Technology,2011(7):99-101,107.
Authors:Wang Baishan
Institution:Wang Baishan(China Railway 18th Bureau Group Co.Ltd.,Tianjin 300222,China)
Abstract:Jinping level 2 water tunnel engineering hydropower station is deeply buried in an area of high natural stress.The tunnel diversion of Jinping hydropower station is deep,high geo-stress.While drilling and blasting in the construction of high stress,we encountered the problems caused by rock-burst,which greatly affected the construction schedule、equipment and personnel security.We summarized the rock-burst pattern in the construction process and did some exploration.Through various forms of the field trials,we summed up the construction methods and measures to control rock burst.
Keywords:hydropower station  headrace tunnel  rock-burst pattern  construction technology