大跨度斜拉桥分离式公轨共面钢箱梁关键施工技术研究
引用本文:毕桂平,李宗平,殷峰,曲洪春.大跨度斜拉桥分离式公轨共面钢箱梁关键施工技术研究[J].世界桥梁,2009(Z1).
作者姓名:毕桂平  李宗平  殷峰  曲洪春
作者单位:1. 上海长江隧桥建设发展有限公司,上海,201209
2. 中交二航局四公司,安徽,芜湖,241009
摘    要:上海长江大桥主通航孔桥为双塔双索面钢箱梁斜拉桥,跨径布置为(92+258+730+258+92) m,采用5跨连续全漂浮体系.梁体采用分离式双主梁形式,单个箱梁为扁平闭口流线型结构.介绍箱梁制造、整体转运、现场安装中的关键技术.

关 键 词:上海长江大桥  斜拉桥  钢箱梁  桥梁施工

Research of Key Construction Techniques for Separated Steel Box Girders of a Long Span Cable-Stayed Bridge Carrying Both Highway and Light Rail
BI Gui-ping,LI Zong-ping,YIN Feng,QU Hong-chun.Research of Key Construction Techniques for Separated Steel Box Girders of a Long Span Cable-Stayed Bridge Carrying Both Highway and Light Rail[J].World Bridges,2009(Z1).
Authors:BI Gui-ping  LI Zong-ping  YIN Feng  QU Hong-chun
Institution:BI Gui-ping1,LI Zong-ping2,YIN Feng1,QU Hong-chun2(1.Shanghai Changjiang Tunnel and Bridge Construction and Development Co.,Ltd.,Shanghai 201209,China,2.The 4th Engineering Company,the 2nd Navigational Engineering Co.,China Communication Construction Corporation,Wuhu 241009,China)
Abstract:The main navigable span bridge of Shanghai Changjiang River Bridge is a steel box girder cable-stayed bridge with double pylons,double cable planes and with span arrangement(92+258+730+258+92) m and the bridge is designed as a 5-span continuous full floating system.The main girders of the bridge are of the separated twin girders,each being a streamlined flat closed structure.In this paper,the key techniques for the manufacturing,the integral transportation and field installation of the girders are presented...
Keywords:Shanghai Changjiang River Bridge  cable-stayed bridge  steel box girder  bridge construction  