首页 | 本学科首页   官方微博 | 高级检索  
     检索      

盾构方案模糊评判
引用本文:秦银刚,刘景铎.盾构方案模糊评判[J].铁路工程造价管理,2011,26(5):33-35.
作者姓名:秦银刚  刘景铎
作者单位:天津市地下铁道集团有限公司,天津,300051
摘    要:针对地铁盾构施工方案,从工期、造价、环境、工程机械投入等方面进行因素分析,采用专家打分法确立模糊矩阵、层次分析法确定各因素权重,并利用模糊综合评判法对地铁某标段盾构施工筹划各方案进行优选,最终确定最优方案。

关 键 词:地铁  盾构施工  模糊矩阵  综合评判  最优方案

Shield Plan Fuzzy Evaluation
Qin Yingang,Liu Jingduo.Shield Plan Fuzzy Evaluation[J].Railway Engineering Cost Management,2011,26(5):33-35.
Authors:Qin Yingang  Liu Jingduo
Institution:Qin Yingang,Liu Jingduo
Abstract:The factors is analyzed from the period, cost, environment and engineering machinery input according to the subway shield construction plan, the expert scoring method is used to establish the fuzzy matrix and the hierarchy analytic method is used to determine the weight of each factor. Then, the fuzzy comprehensive evaluation method is used to compare metro shield construction plans and determine the optimum one.
Keywords:the subway  shield construction  fuzzy matrix  comprehensive evaluation  the optimum scheme
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号