长江航道整治工程恶劣工况深水铺排悬链线理论研究及应用
引用本文:冯海暴.长江航道整治工程恶劣工况深水铺排悬链线理论研究及应用[J].中国港湾建设,2014(1):22-25,31.
作者姓名:冯海暴
作者单位:[1]中国海洋大学工程学院,山东青岛266100 [2]中交一航局第二工程有限公司,山东青岛266071 [3]山东大学,山东济南250101
摘    要:结合长江南京以下12.5m深水航道一期工程,应用悬链线理论详细分析计算了作业水深35m、流向角20°、流速2m/s工况下的铺排排体受力情况,并对异步放排移船工艺进行了优化,提出了铺排初次下排排头控制方法,给出了铺排作业中的一次最佳移船长度。将计算理论进行了35m水深的现场验证,两者吻合。在铺排作业时,可参考悬链线理论应用技术指导施工。

关 键 词:长江航道  铺排  悬链线  水流力

Theoretical study and application on the arrangement of catenary in deepwater under severe operation conditions of the Yangtze River channel regulation project
FENG Hai-bao.Theoretical study and application on the arrangement of catenary in deepwater under severe operation conditions of the Yangtze River channel regulation project[J].China Harbour Engineering,2014(1):22-25,31.
Authors:FENG Hai-bao
Institution:FENG Hai-bao (1. College of Engineering, Ocean University of China, Qingdao, Shandong266100, China; 2. No. 2 Eng. Co., Ltd. of CCCC first Harbor Engineering Co., Ltd., Qingdao, Shandong 266071, China; 3. Shandong University, Jinan, Shandong 250101, China)
Abstract:Combining with the first phase of the 12.5 m deepwater channel under the Yangtze River in Nanjing, applying the theory of catenary, this paper analyzes and calculates the geomattress force situation under the operation conditions of 35 m water depth, flow to the Angle of 20° and velocity of 2 m/s, and optimizes the asynchronous rafting of shifting process, puts forward the head of under catenary control method when first arrangement, gives a best ship moving length in the arrangement. The com- puting theory is put into on-site practices by using the 35 m depth water, and the test results coincided well with calculation. When doing the arrangement works, the catenary theory application technology can be referenced to guide the construction.
Keywords:the Yangtze River channel  arrangement  catenary  flow force