首页 | 本学科首页   官方微博 | 高级检索  
     检索      

硬岩质隧道超欠挖对造价的影响及控制超欠挖的技术措施
引用本文:车正伟.硬岩质隧道超欠挖对造价的影响及控制超欠挖的技术措施[J].交通标准化,2013(7):121-123.
作者姓名:车正伟
作者单位:贵州省交通建设工程造价管理站,贵州贵阳,550003
摘    要:在隧道施工中不可避免的会发生超欠挖,分析硬岩质隧道超欠挖技术影响因素,以及超欠挖技术对隧道施工造价的影响,总结了处理这些问题的一些技术措施,可为以后的施工生产、预算及成本控制提供参考.

关 键 词:隧道  超欠挖  造价控制  技术措施

Influence on Hard Rock Tunnel Over Excavation on Cost and Technical Measure of Control Over Excavation
CHE Zheng-wei.Influence on Hard Rock Tunnel Over Excavation on Cost and Technical Measure of Control Over Excavation[J].Communications Standardization,2013(7):121-123.
Authors:CHE Zheng-wei
Institution:Guizhou Province Traffic Construction Engineering Cost Management Station
Abstract:Over excavation can not be avoided in tunnel construction. This article analyzes influence factors of hard rock tunnel over excavation and the influence of hard rock tunnel technology over excavation on cost, summarizes some technical measures to deal with these issues, which way provide references for construction, budget and cost control in future.
Keywords:tunnel  ultra excavation  cost control  technical measure
本文献已被 万方数据 等数据库收录!
点击此处可从《交通标准化》浏览原始摘要信息
点击此处可从《交通标准化》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号