首页 | 本学科首页   官方微博 | 高级检索  
     检索      

下穿高速公路顶推箱涵设计与施工关键技术
引用本文:曹豫涛.下穿高速公路顶推箱涵设计与施工关键技术[J].交通标准化,2010(22):114-116.
作者姓名:曹豫涛
作者单位:河南省交通规划勘察设计院有限责任公司,河南郑州450052
摘    要:在地质条件为软弱土和液化土、地下水位较高、箱涵绝大部分在地下水位以下等情况下,郑州至开封高速公路箱涵成功地下穿京港澳高速公路分离式立交桥,为我国在复杂情况下下穿高速公路大型斜向箱涵顶推提供了丰富的设计和施工经验。

关 键 词:高速公路  顶推箱涵  下穿

Design and Construction Key Technologies of Pushing Box Culvert Passing through Beneath Expressway
CAO Yu-tao.Design and Construction Key Technologies of Pushing Box Culvert Passing through Beneath Expressway[J].Communications Standardization,2010(22):114-116.
Authors:CAO Yu-tao
Institution:CAO Yu-tao(Transportation Planning Survey and Design Institute in Henan province Co.,Ltd.,Zhengzhou 450052,China)
Abstract:The box culvert of the expressway from Zhengzhou to Kaifeng passed through successfully beneath the expressway from Beijing to Hong Kong and Macao in complex situations,such as the soft soil and liquefaction of soil,higher water table,groundwater above the box culvert in most cases,etc,which provides a wealth of design and construction experience to push large diagonal box culvert passing through beneath expressway in complex situations in China.
Keywords:expressway  pushing box culvert  passing through beneath
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号