浅埋偏压大断面隧道掘进工艺的改进及应用
引用本文:李世贵,赵 恒,任 仁,程 灏.浅埋偏压大断面隧道掘进工艺的改进及应用[J].交通标准化,2013(11):43-45.
作者姓名:李世贵  赵 恒  任 仁  程 灏
作者单位:贵州高速公路开发总公司,贵州贵阳,550004
摘    要:在浅埋偏压特大断面隧道施工进洞过程中,对双侧壁导坑法进行优化改进,利用临时斜撑,对拉锚杆加固核心土。结合隧道施工监控量测,视围岩的变形稳定情况,确定开挖进尺,适时拆除临时支撑。随着该隧道施工进洞安全有序推进,改进后的双侧壁导坑法在龙头山特大断面隧道施工进洞过程中得到成功实践应用。

关 键 词:浅埋  偏压  双侧壁导坑法  临时斜撑

Improvement and Application of Excavation Process of Large Section Tunnel with Unsymetrical Pressure and Shallow Bury
LI Shi-gui,ZHAO Heng,REN Ren and CHENG Hao.Improvement and Application of Excavation Process of Large Section Tunnel with Unsymetrical Pressure and Shallow Bury[J].Communications Standardization,2013(11):43-45.
Authors:LI Shi-gui  ZHAO Heng  REN Ren and CHENG Hao
Institution:(Guizhou Expressway Development Corporation,Guiyang 550004,China)
Abstract:During the execavation process of the shallow-buride tunnel with unsymmetrical pressure and large section, the both side drift method is optimized, the temporary supporting is used and the rock bolt is used to reinforce core soil. Combination with thegeological prediction, deformation and stability of surrounding rock we can determine the excavation footage, the timely removal of temporary support. With the tunnel construction in safety and orderly propulsion, the both side drift method with improvement had been successfully applicated in the execavation of Longtoushan tunnel entrance with large section.
Keywords:shallow-bury  unsymetrical pressure  both side drift method  temporary diagonal support