首页 | 本学科首页   官方微博 | 高级检索  
     检索      

煤系地层隧道整体下沉的监控量测
引用本文:方曦晨.煤系地层隧道整体下沉的监控量测[J].国防交通工程与技术,2010,8(3):61-62,67.
作者姓名:方曦晨
作者单位:福建三明高速公路有限责任公司,福建,三明,365000
摘    要:通过具体实例判断隧道在煤系地层中存在整体下沉现象。具体监控量测方法是在隧底和拱顶布点,观察二者的下沉量是否同步,据此可以判断煤系地层中隧道是否存在整体下沉,随后的施工实践验证了量测结果及由此推断出的结论的正确性。为煤系地层隧道施工提供了一个新的施工监测方法。

关 键 词:煤系地层  隧道  整体下沉  监控量测

The Monitoring of the Integral Settlement of the Tunnel in the Coal Stratum
Fang Xichen.The Monitoring of the Integral Settlement of the Tunnel in the Coal Stratum[J].Traffic Engineering and Technology for National Defence,2010,8(3):61-62,67.
Authors:Fang Xichen
Institution:Fang Xichen(Sanming Expressway Co.Ltd.of Fujian Province,Sanming 365000,China)
Abstract:With practical projects as examples,the integral settlement of the tunnel in the coal strata is studied and analyzed in the paper.To be more specific,some points for observation are located at both the top of and the bottom of the arch of the tunnel,and the settling extents of the two are compared.It is then found out whether the settlement at those two places is in step,according the result of the observation of which whether there is integral settlement in the tunnel can thus be determined,the correctness of the survey results of which is already verified by the subsequent construction and survey practice.It may serve as a new survey and monitoring method for the construction of tunnels in coal strata.
Keywords:coal strata  tunnel  integral settlement  monitoring
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号