拆除旧桥顶进新桥施工技术
引用本文:古兰玉.拆除旧桥顶进新桥施工技术[J].国防交通工程与技术,2006,4(4):54-57.
作者姓名:古兰玉
作者单位:中铁六局集团有限公司,北京,100036
摘    要:结合怀柔区迎宾南路与京承线相交处的旧桥改造,介绍采用切割法切割既有U形铁路混凝土桥、D24军便梁加固既有铁路以及桥体顶进施工的工艺,为类似的工程提供一定的借鉴。

关 键 词:旧桥拆除  军便梁加固  框架桥顶进
文章编号:1672-3953(2006)04-0054-4
收稿时间:2006-07-24
修稿时间:2006年7月24日

Construction Techniques for Demolishing an Old Pre-stressed U-type Bridgeand Jacking-in a New Reinforced Concrete Frame Bridge
GU Lan-yu.Construction Techniques for Demolishing an Old Pre-stressed U-type Bridgeand Jacking-in a New Reinforced Concrete Frame Bridge[J].Traffic Engineering and Technology for National Defence,2006,4(4):54-57.
Authors:GU Lan-yu
Institution:The Sixth Bureau Group of the Railway Ministry of China,Beijing 100036,China
Abstract:With the transformation of the old bridge at the crossroads of the Yingbinnan Road and the Beijing-Chengde Railway in Huairou District as a practical example, the cutting method adopted for cutting the existing U-type railway concrete bridge, the method of strengthening the existing railway with D-24 military convenient girders, and the construction process for jacking in the new bridge body are presented in the paper. This construction process may serve as a reference for similar projects in future.
Keywords:demolition of old bridges  strengthening with military convenient girders  jacking-in a new reinforced concrete frame bridge