首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于三维非连续几何模型的盾构施工模拟
引用本文:李宇杰,何平,秦东平,梁英俊.基于三维非连续几何模型的盾构施工模拟[J].北方交通大学学报,2012(4):38-43.
作者姓名:李宇杰  何平  秦东平  梁英俊
作者单位:[1]北京交通大学隧道及地下工程教育部工程研究中心,北京100044 [2]北京市轨道交通建设管理有限公司,北京100037 [3]中铁工程设计咨询集团有限公司,北京100055
基金项目:国家自然科学基金资助项目(50778012); 苏州轨道交通盾构管片合理设计及优化研究基金项目资助(C09L00500)
摘    要:以苏州地铁一号线工程为研究背景,建立考虑管片分块、连接螺栓及施工过程各因素的三维非连续几何模型,对盾构法施工过程进行仿真模拟.论述了盾构开挖系统模型的几何非线性方程组的推导过程,盾构顶进推力及注浆材料性质的计算方法.模拟计算结果显示:盾构管片内外侧表面大部分区域处于受压状态,拱顶与拱底部位及靠近连接螺栓的部分区域处于受拉状态;受盾构顶推力作用,盾构开挖面前方土体有一个典型的隆起区域,地表最大隆起值为2.5 mm,出现在盾构开挖面前方8.5 m处;盾构开挖面后方土体沿隧道纵向的沉降受注浆材料影响随时间变化,并逐渐趋于稳定;在盾构法施工中,各管片连接处的土体受施工影响明显,土体塑性区范围较大.

关 键 词:盾构施工  三维非连续几何模型  管片  螺栓  弹塑性本构模型

Simulation of shield tunnel construction process base on 3D discontinuous geometry model
LI Yujie,HE Ping,QIN Dongping,LIANG Yingjun.Simulation of shield tunnel construction process base on 3D discontinuous geometry model[J].Journal of Northern Jiaotong University,2012(4):38-43.
Authors:LI Yujie  HE Ping  QIN Dongping  LIANG Yingjun
Institution:1. Tunneling and Underground Engineering Research Center of Ministry of Education; Beijing Jiaotong University, Beijing 100044,China;2. Beijing MTR Construction Administration Corporation, Beijing 100037 ,China; 3. China Railway Engineering Consultant Group,Beijing 100055, China)
Abstract:Abstract:Based on the 1 g metro line of Suzhou, a 3D discontinuous geometry model about segment blocks, connecting bolts and construction process factors was built to simulate the construction process. It mainly intro- duces the derivation process of geometry nonlinear equations of shield tunnel excavation model, and the calcula- tion method of shidd thrust force and grouting material properties. The simulate results show that, nac~t of the area on the inside and outside surface of shield segment am in compression, rome area on top and bottom posi- tion of tunnel are in tension, and the pesition near the cormecting bolt are also in tension. Because of shield jacking force, there is a typical uplift area ahead of shidd excavation face. The maximum uplift value on ground is 2.5 mm, and the distance between the maximum uplift section and shidd excavation face is 8.5 m. Due to grouting material properties change with time, the ground settlement curves along tunnel centerline which behind shield excavation face are ups and downs, but they finally tend to stabilize. During shidd tunnel construction process, the soil which near the segment joints is obviously affected by construction, so the soil plastic area is bigger than other positions.
Keywords:shield tunnel construction  3D discontinuous geometry model  segment  bolt  elastic-plastic constitutive model
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号