首页 | 本学科首页   官方微博 | 高级检索  
     检索      

澜沧江橄榄坝河段护岸工程试验研究
引用本文:庹瑶,许光祥,疏玉清.澜沧江橄榄坝河段护岸工程试验研究[J].重庆交通大学学报(自然科学版),1999,18(3):105-109.
作者姓名:庹瑶  许光祥  疏玉清
作者单位:重庆交通学院河海工程系,重庆,400074
摘    要:在对澜沧江橄榄坝河岸坍塌原因进行了详细分析的基础上. 提出河岸治理应以控制落水期中水流向为主, 综合考虑航运、防洪、护岸等因素. 通过模型试验研究, 根据治理原则而采取的工程措施是可行的.

关 键 词:河岸坍塌  护岸工程  中水流向
文章编号:1001-716(1999)03-0105-05
修稿时间::1998-04-01

The Testing Research of River Bank-Protecting Project for Gan Lanba River Reach of Lanchang-Mekon River
TUO Yao,XU Guang-xiang,SU Yu-qing.The Testing Research of River Bank-Protecting Project for Gan Lanba River Reach of Lanchang-Mekon River[J].Journal of Chongqing Jiaotong University,1999,18(3):105-109.
Authors:TUO Yao  XU Guang-xiang  SU Yu-qing
Abstract:The paper is based on detailed analysis of the cause for the cave of Gan Lanba river bank of Lanchang-Mekon River.It is suggested that the control of flow direction median during the low water level period plays a leading role in the river bank.Training considering navigation,flood-proof and bank paving comprechensively,through Model-testing research various constructing methods adopted according to this regulation is proved to be practicable.
Keywords:the caving of river bank  riverbank protecting project  flow direction median
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号