首页 | 本学科首页   官方微博 | 高级检索  
     检索      

考虑定制化列车的运行图与能力协同优化方法
引用本文:李晓娟,石佳娜,李得伟,闫振英.考虑定制化列车的运行图与能力协同优化方法[J].交通运输系统工程与信息,2021,21(1):95-100.
作者姓名:李晓娟  石佳娜  李得伟  闫振英
作者单位:1. 内蒙古大学,交通学院,呼和浩特 010070;2. 西南交通大学,交通运输与物流学院,成都 610031; 3. 北京交通大学,交通运输学院,北京 100044
基金项目:国家自然科学基金/National Natural Science Foundation of China(71971019);科技部重点研发计划/National Key Research and Development Program of China(2018YFB1201402);内蒙古自治区教育科学研究“十三五”规划课题/The“13th Five Year”Plan of Educational Science Research in Inner Mongolia (NGJGH2018016)。
摘    要:基于调查数据建立旅客在不同时间段的乘车概率函数,分析旅客对定制化列车的开行时间及坐席类型等具体需求。考虑需求、停站、运行时间等约束条件建立定制化列车开行备选集,整合可行的定制化列车开行方案。建立加开定制化列车情况下,同时满足企业收益最大化和剩余可用能力最大化的双层协同优化模型。构建优化算法进行模型求解,得到基于定制化列车,且同时考虑既有列车调整成本和能力使用情况的运行图。最后,以内蒙古自治区呼和浩特-乌海线路为例进行分析,结果表明,既有列车的单位调整成本会影响定制化列车的开行,定制化列车的开行对运行图的整体结构和剩余可用能力也均有影响。

关 键 词:铁路运输  定制化列车  运行图  通过能力  协同优化  
收稿时间:2020-08-03

Collaborative Optimization of Railway Timetable and Capacity Considering Customized Trains
LI Xiao-juan,SHI Jia-na,LI De-wei,YAN Zhen-ying.Collaborative Optimization of Railway Timetable and Capacity Considering Customized Trains[J].Transportation Systems Engineering and Information,2021,21(1):95-100.
Authors:LI Xiao-juan  SHI Jia-na  LI De-wei  YAN Zhen-ying
Institution:1. College of Traffic, Inner Mongolia University, Hohhot 010070, China; 2. School of Transportation and Logistics, Southwest Jiaotong University, Chengdu 610031, China; 3. School of Traffic and Transportation, Beijing Jiaotong University, Beijing 100044
Abstract:Based on survey data, this paper proposes the passenger's travel probability function for different time periods and analyzes passenger's specific needs for customized trains such as the expected operation time and the type of seats. An alternative set of customized trains was established with the constraints of demand, stop and operation time. Then a bi-level collaborative optimization model was developed to maximize the enterprise profits while keep the remaining available capacity as the maximum when adding customized trains. The particle swarm optimization algorithm was used to solve the model. Then, a timetable was obtained with the consideration of the customized trains and the adjustment cost and capacity utilization of existing trains. The Hohhot-Wuhai railway line in Inner Mongolia, China was analyzed as an example. It was found that the operation of customized trains is affected by the adjustment cost of existing trains. The operation of customized trains also affects the overall layout of timetable and remaining available capacity of trains.
Keywords:railway transportation  customized trains  timetable  capacity  collaborative optimization  
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《交通运输系统工程与信息》浏览原始摘要信息
点击此处可从《交通运输系统工程与信息》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号