首页 | 本学科首页   官方微博 | 高级检索  
     检索      

石塘隧道煤系岩层塌方处治技术及效果评价
引用本文:黄云科.石塘隧道煤系岩层塌方处治技术及效果评价[J].交通科技与经济,2012,14(6):80-82,86.
作者姓名:黄云科
作者单位:重庆交通大学土木建筑学院,重庆,400074
摘    要:介绍石塘隧道K62+797.5~K62+755段的地质和塌方情况,并对塌方原因进行分析,提出塌方前区段加固方案和塌方处理方案,指出塌方段施工的注意事项,为塌方段施工提供技术参考。通过数值模拟加固后塌方段的监控量测结果可知,所选方案可以取得不错的效果。

关 键 词:隧道  塌方  数值模拟  监控量测

The countermeasure to the landslide in coal rock layer of Shitang tunnel
HUANG Yun-ke.The countermeasure to the landslide in coal rock layer of Shitang tunnel[J].Technology & Economy in Areas of Communications,2012,14(6):80-82,86.
Authors:HUANG Yun-ke
Institution:HUANG Yun-ke (School of Civil Engineering and Architecture,Chongqing Jiaotong University, Chongqing 400074,China)
Abstract:It introduces the landslide situation in Shitang tunnel(K62+797.5--K62+755 section), and ana- lyzes the landslide formation, provides the landslide reinforcement plan and the reactional process. Analysis is made on the precantions of construction in the section of landslide,and on the technological support, especially in numerical simulation that the reconstruction plan sounds reasonable.
Keywords:tunnel  landslide  numerical simulation  monitoring and measurement
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号