外滩通道建筑物保护及周边环境影响分析
引用本文:马元,黄德中,胡斌.外滩通道建筑物保护及周边环境影响分析[J].交通科技与经济,2011,13(1):8-12.
作者姓名:马元  黄德中  胡斌
作者单位:上海隧道工程股份有限公司,上海,200000
基金项目:上海市科学技术委员会项目(09xd1422700)
摘    要:国内采用超大直径土压平衡盾构法施工属首次,以Ф14270mm超大直径土压平衡盾构为对象,对盾构穿越建筑物的风险进行评估,采用数值模拟方法比较加固前后浦江饭店基础沉降和水平位移以及隧道轴线地表沉降;穿越中采用FCEC法对建筑物进行超前保护,使建筑物沉降控制在10mm内;在盾构推进过程中对周边环境的影响从横向和纵向两方面进行分析;通过现场监测和理论计算对照,表明建筑物在盾构穿越过程中沉降控制良好,具有一定的工程参考意义。

关 键 词:超大直径  土压平衡盾构  数值模拟分析  隔离桩  FCEC钻孔灌注桩  环境影响  

Buildings Protection and the Surrounding Environmental Impact Analysis in Bund Passage Project
MA Yuan,HUANG De-zhong,HU Bin.Buildings Protection and the Surrounding Environmental Impact Analysis in Bund Passage Project[J].Technology & Economy in Areas of Communications,2011,13(1):8-12.
Authors:MA Yuan  HUANG De-zhong  HU Bin
Institution:MA Yuan,HUANG De-zhong,HU Bin(Shanghai Tunnel Engineering Co.,LTD,Shanghai 200000,China)
Abstract:It's the first time that the super diameter Earth Pressure Balanced Shield was used in China.Here we have made a risk assessment for the shield boring across the building,with target of Ф14 270 mm Earth Pressure Balanced Shield.Numerical Simulation Analysis was used to compare the foundation settlement horizontal movement of Pujiang Restaurant,settlement of tunnel ground before and after the reinforcement,and results show that effect of reinforcement significantly,with less settlement;FCEC construction methodology was used to fore-protect the building,limiting the settlement of the building within 10mm.Make analysis for the lateral portrait impaction for the surrounding environment during tunneling.According to the comparison of site monitoring and theoretical analysis,settlement and deformation of the building got controlled,so it is meaningful for construction reference.
Keywords:super diameter  Earth Pressure Balanced Shield  Numerical Simulation Analysis  isolation Pile  FCEC Bored Pile  environment impaction  