武汉二七长江大桥钢槽梁顶推中局部应力监测与分析
作者姓名:赵利平  尹超裕  肖剑  张建球
作者单位:长沙理工大学水利工程学院
摘    要:利用混合单元法,对支撑处的钢槽梁进行局部有限元仿真计算,并以武汉二七长江大桥非通航孔6×90 m钢槽梁顶推工程为背景,对钢槽梁关键截面测点应力跟踪测试和处理分析.分析结果表明:顶推过程中,测点实际受力情况与有限元模拟结果吻合比较好,表明选取计算模型是可行的;支撑处钢槽梁实测最大应力未超出钢材允许应力,钢槽梁结构横桥向受...

关 键 词:顶推  钢槽粱  混合建模  局部应力  应力监测

Local stress monitoring and analysis in steel racks beam incremental launching construction of Wuhan Erqi Yangtze River Bridge
Authors:ZHAO Li-ping  YIN Chao-yu  XIAO Jian  ZHANG Jian-qiu
Institution:(School of Water Conservancy,Changsha University of Science & Technology,Changsha 410004,China)
Abstract:As a background project,the 6×90 m steel racks beams of the navigation spans of the Wuhan Erqi Yangtze river bridge,which were constructed with incremental launching,were simulated with the hybrid modeling for the steel racks beam on support place.The stress of the measuring points on the critical sections was measured and analyzed.The results show that during the process of incremental launching,the actual stresses of measuring points are in good agreement with the simulated results,and validity of the selection calculation model was proved.The measured maximum stresses of the steel racks beam on support place didn’t exceed the allowable stress of steel,the stress of the steel racks beam structure is uniform in lateral direction.The design of construction technology is reasonable and safe.
Keywords:incremental launching  steel racks beam  hybrid modeling  local stress  stress monitoring
本文献已被 CNKI 等数据库收录!