首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于比值更新的索穹顶结构找力分析方法
引用本文:姜正荣,刘小伟,石开荣,林全攀.基于比值更新的索穹顶结构找力分析方法[J].西南交通大学学报,2020,55(1):150-157.
作者姓名:姜正荣  刘小伟  石开荣  林全攀
基金项目:广州市科技计划项目(1563000257);亚热带建筑科学国家重点实验室开放课题(2019ZB27)
摘    要:为了快速高效求解索穹顶结构的预应力分布,提出了一种基于比值更新的找力新方法. 以不断更新的索预应力比值来分配拉索预应力,以索力和位形作为收敛控制参数,迭代得到满足精度要求的预应力分布. 基于此,首先对索穹顶结构进行了不考虑重力影响的找力分析,验证了该方法的正确性;其次当考虑重力影响且每个索段划分为多个单元时,可引入沿索长的索水平分力这一不变量,将索力的比值替换为索水平分力的比值. 结果表明:基于比值更新的找力分析方法计算速度快,位形偏差小,精度高;考虑重力影响的找力分析结果与不考虑重力影响相差较大(最大为19.34%),索穹顶结构的找力分析宜考虑重力的影响;将每个索段划分为单个单元和多个单元的找力分析结果相差甚微(最大仅0.05%),当索预应力较大且索长较短时,可将每个索段划分为单个单元以简化求解预应力分布. 

关 键 词:索穹顶结构    找力分析    基于比值更新的找力分析方法    索水平分力
收稿时间:2018-03-19

Method of Force-Finding Analysis Based on Ratio Updating for Cable Domes
JIANG Zhengrong,LIU Xiaowei,SHI Kairong,LIN Quanpan.Method of Force-Finding Analysis Based on Ratio Updating for Cable Domes[J].Journal of Southwest Jiaotong University,2020,55(1):150-157.
Authors:JIANG Zhengrong  LIU Xiaowei  SHI Kairong  LIN Quanpan
Abstract:In order to determine the prestress distribution of cable domes efficiently, a new method of force-finding analysis based on ratio updating was proposed. In this method, values of cable prestresses are pre-assumed and then constantly adjusted according to the continuously updated ratio of cable prestress; the precise prestress distribution of cable dome is acquired by iterations using the cable force and geometric shape as convergence control parameters. In this way, a force-finding analysis of cable domes is first conducted without considering the gravity effect, which verifies the effectiveness of this method. When the gravity is considered, each cable segment is divided into multiple units. An invariant, the cable force’s horizontal component along the length is introduced and the ratio of cable force is then replaced by that of the horizontal component force to deal with the situation with gravity. The results show that the method of force-finding analysis based on ratio updating is characterized by fast computational speed, small geometric shape deviation, and high precision. The results of force-finding analysis considering the influence of gravity are significantly different from those without considering gravity, and the maximum deviation reaches 19.34%. Thus, the influence of gravity should be taken into account in force-finding analysis of cable domes. In addition, whether each cable segment is divided into one unit or multiple units, the results of force-finding analysis make little difference (0.05% maximum deviation). Therefore, in cases when the cable prestress is large and cable length is short, each cable segment could be divided into only one unit to simplify the solving process of prestress distribution. 
Keywords:
本文献已被 CNKI 等数据库收录!
点击此处可从《西南交通大学学报》浏览原始摘要信息
点击此处可从《西南交通大学学报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号